The second floor of this house was torn down to framing and reinsulated with closed cell spray foam. New LED light fixtures and some new wiring. Local spruce boards on the slopes and ceiling. Built-in shelving.

in progress

bed and built-ins

slope with local shiplap spruce

slope/skylight